Serveur MCP

liftlog

us.artificl/liftlog

Ce que fait ce MCP

Tracks forklift and aerial-lift operator, inspection, and maintenance requirements and identifies citable compliance gaps.

export_lift_log
Export the full lift compliance log as CSV text (operator or machine, requirement, next due, status, chase history).
Schéma d’entrée
{'type': 'object', '$schema': 'https://json-schema.org/draft/2020-12/schema', 'properties': {}}
get_lift_summary
Get the lift compliance summary: totals for tracked requirements, not done, overdue and citable, due this week, and awaiting records.
Schéma d’entrée
{'type': 'object', '$schema': 'https://json-schema.org/draft/2020-12/schema', 'properties': {}}
get_requirements_due
List operator evaluations, inspections, and maintenance intervals due within the next N days (default 30).
Schéma d’entrée
{'type': 'object', '$schema': 'https://json-schema.org/draft/2020-12/schema', 'properties': {'days': {'type': 'number', 'description': 'Look-ahead window in days (default 30).'}}}
list_citable_items
List overdue or missing compliance items — the ones that would be citable in an OSHA inspection or damaging in an injury investigation. Most serious first.
Schéma d’entrée
{'type': 'object', '$schema': 'https://json-schema.org/draft/2020-12/schema', 'properties': {}}
search_requirements
Search lift compliance requirements by operator name, machine, or requirement type. Returns matching records with next due date and status.
Schéma d’entrée
{'type': 'object', '$schema': 'https://json-schema.org/draft/2020-12/schema', 'properties': {'query': {'type': 'string', 'description': 'Text to match against operator, machine, or requirement (case-insensitive; shorthand like "PM" or "aerial lift" works). Omit to list everything.'}}}
Ajouté
export_lift_log
17 September 2026 12:55
Ajouté
get_lift_summary
17 September 2026 12:55
Ajouté
get_requirements_due
17 September 2026 12:55
Ajouté
list_citable_items
17 September 2026 12:55
Ajouté
search_requirements
17 September 2026 12:55