Watt Street — US grid, interconnection queue and data center power

net.wattstreet/grid
Données et analytique Science et ingénierie Public et accessible MCP 2026-07-28

Ce que fait ce MCP

Provides US grid interconnection, county power, project queue, deadline, policy, and large-load request data.

account_status
API credit balance
Credits remaining on the calling key, and how to top up without a human.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {}}
county_profile
County grid profile
Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'required': ['state'], 'properties': {'state': {'type': 'string', 'description': 'Two-letter state code'}, 'county': {'type': 'string', 'description': "County name, e.g. 'Loudoun'"}}}
interconnection_deadlines
Interconnection deadline calendar
Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it has been checked — a date marked unconfirmed came from a secondary source and has not been verified against the authority's own tariff. Do not present an unconfirmed date as a commitment.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {'rto': {'type': 'string', 'description': 'PJM, MISO, CAISO, SPP, NYISO, ISONE, ERCOT or FERC'}, 'upcoming_only': {'type': 'boolean', 'default': True}}}
load_ledger
Data-center power requests (The Load Ledger)
Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most cannot be attributed to data centers or any other industry. Does not yet include ERCOT, PJM, MISO, CAISO, SPP or ISO-NE. Filter by state or size.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {'limit': {'type': 'number', 'default': 25}, 'state': {'type': 'string'}, 'min_mw': {'type': 'number'}}}
map_data
Map data (GeoJSON)
GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {'layer': {'enum': ['all', 'generation', 'load', 'datacenters'], 'type': 'string', 'default': 'all'}}}
policy_events
Grid policy & moratoria
Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {'direction': {'enum': ['opening', 'closing', 'neutral'], 'type': 'string'}}}
search_projects
Search grid interconnection projects
Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome.
Lecture seule Idempotent
Schéma d’entrée
{'type': 'object', 'properties': {'fuel': {'type': 'string', 'description': 'Solar, Wind, Battery, Gas, Nuclear, Hybrid…'}, 'limit': {'type': 'number', 'default': 25}, 'state': {'type': 'string', 'description': 'Two-letter state code'}, 'min_mw': {'type': 'number'}, 'region': {'type': 'string', 'description': 'ERCOT, PJM, MISO, CAISO, NYISO, ISONE, SPP, BPA or a utility name'}, 'status': {'enum': ['active', 'completed', 'withdrawn', 'suspended'], 'type': 'string'}}}
Ajouté
account_status
17 September 2026 12:54
Ajouté
interconnection_deadlines
17 September 2026 12:54
Ajouté
policy_events
17 September 2026 12:54
Ajouté
map_data
17 September 2026 12:54
Ajouté
load_ledger
17 September 2026 12:54
Ajouté
county_profile
17 September 2026 12:54
Ajouté
search_projects
17 September 2026 12:54