Servidor MCP

engineering

tech.novtriq/engineering

Qué hace este MCP

Performs built-environment engineering calculations and compliance assessments covering energy, carbon, BIM, cybersecurity, structural design, HVAC, planning, and construction costs.

assess_epbd_score
Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.
Esquema de entrada
{'type': 'object', 'required': ['building_type', 'year_built', 'current_epc', 'heating_system', 'has_solar_pv', 'floor_area_m2', 'country'], 'properties': {'country': {'type': 'string', 'description': 'e.g. germany, france, netherlands, ireland, uk'}, 'year_built': {'type': 'integer'}, 'current_epc': {'enum': ['A', 'B', 'C', 'D', 'E', 'F', 'G'], 'type': 'string'}, 'has_solar_pv': {'type': 'boolean'}, 'building_type': {'type': 'string', 'description': 'e.g. office, residential, retail, school, hospital'}, 'floor_area_m2': {'type': 'number'}, 'heating_system': {'type': 'string', 'description': 'gas_boiler, heat_pump, district_heating, electric, oil_boiler, biomass'}}}
building_carbon_footprint
Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.
Esquema de entrada
{'type': 'object', 'required': ['building_type', 'floor_area_m2', 'location', 'year_built'], 'properties': {'location': {'enum': ['uk', 'eu', 'uae'], 'type': 'string'}, 'occupancy': {'type': 'number'}, 'year_built': {'type': 'integer'}, 'refrigerant': {'enum': ['hfc', 'hfo', 'none'], 'type': 'string'}, 'gas_kwh_year': {'type': 'number'}, 'building_type': {'enum': ['office', 'retail', 'industrial', 'datacentre', 'healthcare', 'education', 'residential'], 'type': 'string'}, 'elec_kwh_year': {'type': 'number'}, 'floor_area_m2': {'type': 'number'}, 'heat_kwh_year': {'type': 'number'}, 'renewable_pct': {'type': 'number'}}}
building_readiness
Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.
Esquema de entrada
{'type': 'object', 'required': ['current_use', 'proposed_use', 'year_built', 'structure', 'floors', 'condition', 'location', 'bim'], 'properties': {'bim': {'enum': ['yes', 'partial', 'no'], 'type': 'string'}, 'floors': {'enum': ['1-3', '4-6', '7-10', '10+'], 'type': 'string'}, 'location': {'enum': ['uk', 'western-eu', 'eastern-eu', 'uae'], 'type': 'string'}, 'condition': {'enum': ['good', 'fair', 'poor', 'unknown'], 'type': 'string'}, 'structure': {'enum': ['concrete', 'steel', 'masonry', 'timber', 'unknown'], 'type': 'string'}, 'year_built': {'enum': ['pre1945', '1945-1970', '1970-1990', '1990-2010', 'post2010'], 'type': 'string'}, 'current_use': {'enum': ['office', 'industrial', 'retail', 'residential'], 'type': 'string'}, 'proposed_use': {'enum': ['office', 'residential', 'healthcare', 'industrial', 'retail'], 'type': 'string'}}}
calculate_carbon
Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.
Esquema de entrada
{'type': 'object', 'required': ['floor_area_m2', 'building_type', 'country'], 'properties': {'country': {'type': 'string', 'description': 'ISO-2: gb, de, fr, nl, es, pl, ro, it, ae, us'}, 'building_type': {'type': 'string', 'description': 'office, residential, retail, industrial, hospital, warehouse, hotel'}, 'floor_area_m2': {'type': 'number'}, 'energy_kwh_year': {'type': 'number', 'description': 'Measured annual energy; 0 to use benchmark'}, 'construction_year': {'type': 'integer'}}}
calculate_pue
Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
Esquema de entrada
{'type': 'object', 'required': ['it_load_kw', 'cooling_kw', 'ups_losses_kw', 'lighting_kw'], 'properties': {'cooling_kw': {'type': 'number', 'description': 'Total cooling system power in kW. Example: 200'}, 'it_load_kw': {'type': 'number', 'description': 'IT equipment power draw in kW. Example: 500'}, 'lighting_kw': {'type': 'number', 'description': 'Lighting power in kW. Example: 1.5'}, 'ups_losses_kw': {'type': 'number', 'description': 'UPS and power distribution losses in kW. Example: 25'}}}
check_grid_feasibility_uae
Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.
Esquema de entrada
{'type': 'object', 'required': ['site_location', 'power_requirement_mw', 'voltage_level', 'intended_use', 'has_existing_supply', 'target_completion_year'], 'properties': {'intended_use': {'enum': ['data_centre', 'commercial', 'industrial', 'mixed'], 'type': 'string'}, 'site_location': {'enum': ['dubai', 'abu_dhabi', 'sharjah', 'ajman', 'other'], 'type': 'string'}, 'voltage_level': {'enum': ['LV', 'MV', 'HV'], 'type': 'string'}, 'has_existing_supply': {'type': 'boolean'}, 'power_requirement_mw': {'type': 'number'}, 'target_completion_year': {'type': 'integer'}}}
check_nis2_readiness
Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.
Esquema de entrada
{'type': 'object', 'required': ['has_ciso', 'has_ot_policy', 'has_board_reporting', 'has_asset_inventory', 'has_network_segmentation', 'has_ir_plan', 'has_24h_reporting', 'has_supplier_assessment', 'has_ot_monitoring', 'organisation_size', 'sector'], 'properties': {'sector': {'type': 'string', 'description': 'e.g. energy, transport, healthcare, banking'}, 'has_ciso': {'type': 'boolean'}, 'has_ir_plan': {'type': 'boolean'}, 'has_ot_policy': {'type': 'boolean'}, 'has_24h_reporting': {'type': 'boolean'}, 'has_ot_monitoring': {'type': 'boolean'}, 'organisation_size': {'enum': ['essential', 'important', 'other'], 'type': 'string'}, 'has_asset_inventory': {'type': 'boolean'}, 'has_board_reporting': {'type': 'boolean'}, 'has_supplier_assessment': {'type': 'boolean'}, 'has_network_segmentation': {'type': 'boolean'}}}
check_uae_bim_compliance
Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.
Esquema de entrada
{'type': 'object', 'required': ['building_area_m2', 'building_floors', 'emirate', 'building_type', 'has_bim_model', 'bim_software', 'ifc_export', 'has_bep'], 'properties': {'emirate': {'enum': ['dubai', 'abu_dhabi', 'sharjah', 'other'], 'type': 'string'}, 'has_bep': {'type': 'boolean'}, 'ifc_export': {'type': 'boolean'}, 'bim_software': {'type': 'string', 'description': 'e.g. Revit 2024'}, 'building_type': {'enum': ['residential', 'commercial', 'healthcare', 'government', 'mixed'], 'type': 'string'}, 'has_bim_model': {'type': 'boolean'}, 'building_floors': {'type': 'integer'}, 'building_area_m2': {'type': 'number'}}}
check_uae_cybersecurity
Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.
Esquema de entrada
{'type': 'object', 'required': ['organisation_type', 'emirate', 'has_isms', 'has_incident_response', 'has_vulnerability_assessment', 'has_third_party_audit', 'has_data_classification', 'is_cloud_hosted'], 'properties': {'emirate': {'type': 'string', 'description': 'dubai, abu_dhabi, sharjah, federal, other'}, 'has_isms': {'type': 'boolean'}, 'is_cloud_hosted': {'type': 'boolean'}, 'organisation_type': {'enum': ['government', 'critical_infrastructure', 'financial', 'telecom', 'other'], 'type': 'string'}, 'has_incident_response': {'type': 'boolean'}, 'has_third_party_audit': {'type': 'boolean'}, 'has_data_classification': {'type': 'boolean'}, 'has_vulnerability_assessment': {'type': 'boolean'}}}
contractor_vetting
NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report.
Esquema de entrada
{'type': 'object', 'required': ['answers'], 'properties': {'answers': {'type': 'object', 'description': 'Map of question_id -> yes|no|unknown. IDs: registered, insurance, no_prosecutions, certifications, references, cvs, cyber_policy, incident_reporting, access_control, assessor_cert, energy_qual, reno_experience'}, 'purpose': {'enum': ['nis2', 'epbd', 'general', 'critical'], 'type': 'string', 'description': 'Vetting purpose'}}}
dgnb_bim_readiness
DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.
Esquema de entrada
{'type': 'object', 'required': ['answers'], 'properties': {'answers': {'type': 'object', 'description': 'Map of question_id -> yes|partial|no. IDs: lca, materials, water, biodiversity, lcc, flexibility, value_stability, cert_budget, comfort, accessibility, wellbeing, satisfaction, bep, cde, competency, clash, integrated_team, commissioning, documentation, poe'}, 'cert_target': {'enum': ['bronze', 'silver', 'gold', 'platinum'], 'type': 'string', 'description': 'Target DGNB level'}}}
digital_renovation_passport
EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.
Esquema de entrada
{'type': 'object', 'required': ['floor_area_m2', 'current_epc', 'heating'], 'properties': {'era': {'type': 'string', 'description': 'Construction era (label only)'}, 'address': {'type': 'string', 'description': 'Building address (label only)'}, 'country': {'type': 'string', 'description': 'Country code (e.g. UK, DE)'}, 'heating': {'enum': ['gas', 'oil', 'hp', 'district', 'electric', 'biomass'], 'type': 'string', 'description': 'Primary heating system'}, 'current_epc': {'enum': ['A', 'B', 'C', 'D', 'E', 'F', 'G'], 'type': 'string', 'description': 'Current EPC band A-G'}, 'building_type': {'type': 'string', 'description': 'Building type (label only)'}, 'floor_area_m2': {'type': 'number', 'description': 'Gross floor area (m2)'}}}
eed_datacentre_pack
EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values.
Esquema de entrada
{'type': 'object', 'required': ['it_power_kw', 'total_energy_kwh', 'it_energy_kwh'], 'properties': {'it_power_kw': {'type': 'number', 'description': 'Installed IT power demand (kW)'}, 'it_energy_kwh': {'type': 'number', 'description': 'EIT: IT energy (kWh/yr)'}, 'water_input_m3': {'type': 'number', 'description': 'WIN: total water input (m3/yr), for WUE'}, 'reused_heat_kwh': {'type': 'number', 'description': 'EREUSE waste heat reused, for ERF'}, 'total_energy_kwh': {'type': 'number', 'description': 'EDC: total data-centre energy (kWh/yr)'}, 'renewable_energy_kwh': {'type': 'number', 'description': 'ERES-TOT renewable energy consumed, for REF'}}}
estimate_cooling_load
Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.
Esquema de entrada
{'type': 'object', 'required': ['space_type', 'floor_area_m2', 'it_load_kw', 'occupancy_persons', 'climate_zone', 'redundancy'], 'properties': {'it_load_kw': {'type': 'number', 'description': 'Required for data_centre/server_room. Set 0 for others.'}, 'redundancy': {'enum': ['N', 'N+1', '2N'], 'type': 'string'}, 'space_type': {'enum': ['office', 'data_centre', 'server_room', 'retail', 'industrial'], 'type': 'string'}, 'climate_zone': {'enum': ['northern_eu', 'central_eu', 'southern_eu', 'uk', 'uae_gcc'], 'type': 'string'}, 'floor_area_m2': {'type': 'number'}, 'occupancy_persons': {'type': 'integer'}}}
eu_cost_benchmarking
Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices.
Esquema de entrada
{'type': 'object', 'required': ['floor_area_m2', 'country', 'project_type'], 'properties': {'bim': {'enum': ['yes', 'no'], 'type': 'string'}, 'country': {'enum': ['UK', 'DE', 'FR', 'NL', 'ES', 'PL', 'RO', 'BE', 'AT', 'UAE', 'SA'], 'type': 'string', 'description': 'Country'}, 'programme': {'enum': ['accelerated', 'standard', 'extended'], 'type': 'string'}, 'procurement': {'enum': ['traditional', 'db', 'epc', 'ppp'], 'type': 'string'}, 'project_type': {'enum': ['office_new', 'resi_new', 'data_centre', 'industrial', 'healthcare', 'retail', 'reno_light', 'reno_deep', 'infrastructure'], 'type': 'string', 'description': 'Project type'}, 'floor_area_m2': {'type': 'number', 'description': 'Gross floor area (m2), min 100'}, 'specification': {'enum': ['basic', 'standard', 'premium', 'ultra'], 'type': 'string'}}}
eurocode_beam_designer
Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.
Esquema de entrada
{'type': 'object', 'required': ['material', 'config', 'span_m', 'udl_kn_m'], 'properties': {'grade': {'type': 'string', 'description': 'Steel: s275/s355. Concrete: c2530/c3037/c3545'}, 'config': {'enum': ['ss', 'cant', 'cont'], 'type': 'string', 'description': 'ss=simply supported, cant=cantilever, cont=continuous 2-span'}, 'span_m': {'type': 'number', 'description': 'Span length (m)'}, 'exposure': {'enum': ['xc1', 'xc2', 'xc3'], 'type': 'string', 'description': 'Concrete exposure class (cover)'}, 'material': {'enum': ['steel', 'composite', 'concrete'], 'type': 'string', 'description': 'Beam material'}, 'udl_kn_m': {'type': 'number', 'description': 'Characteristic uniformly distributed load (kN/m)'}, 'fire_rating': {'enum': ['r30', 'r60', 'r90', 'r120'], 'type': 'string', 'description': 'Required fire rating'}, 'load_position': {'type': 'number', 'description': 'Point-load position as fraction of span 0-1 (default 0.5)'}, 'point_load_kn': {'type': 'number', 'description': 'Characteristic point load (kN), optional'}}}
eurocode_column_checker
Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.
Esquema de entrada
{'type': 'object', 'required': ['axial_load_kn', 'effective_length_m', 'material'], 'properties': {'section': {'type': 'string', 'description': 'Steel section key, e.g. UC203x203x46 (steel only)'}, 'depth_mm': {'type': 'number', 'description': 'RC column depth h (mm), concrete only'}, 'material': {'enum': ['S275', 'S355', 'C25', 'C30'], 'type': 'string', 'description': 'Section material'}, 'width_mm': {'type': 'number', 'description': 'RC column width b (mm), concrete only'}, 'axial_load_kn': {'type': 'number', 'description': 'Design axial load NEd (kN)'}, 'buckling_curve': {'enum': ['a', 'b', 'c', 'd'], 'type': 'string', 'description': 'EC3 buckling curve (steel only)'}, 'eccentricity_mm': {'type': 'number', 'description': 'Load eccentricity (mm), optional'}, 'reinforcement_pct': {'type': 'number', 'description': 'RC reinforcement ratio % (concrete only)'}, 'effective_length_m': {'type': 'number', 'description': 'Effective (buckling) length Lcr (m)'}}}
get_technical_dd_quote
Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.
Esquema de entrada
{'type': 'object', 'required': ['building_type', 'gross_area_m2', 'transaction_type', 'disciplines', 'geography', 'timeline_weeks'], 'properties': {'geography': {'enum': ['uk', 'eu', 'uae', 'gcc'], 'type': 'string'}, 'disciplines': {'type': 'array', 'items': {'enum': ['structural', 'mep', 'compliance', 'energy', 'nis2'], 'type': 'string'}}, 'building_type': {'type': 'string', 'description': 'office, data_centre, industrial, retail, residential, mixed_use, hotel, warehouse, healthcare'}, 'gross_area_m2': {'type': 'number'}, 'timeline_weeks': {'type': 'integer'}, 'transaction_type': {'enum': ['acquisition', 'disposal', 'refinancing', 'planning'], 'type': 'string'}}}
heatpump_heatloss
Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured.
Esquema de entrada
{'type': 'object', 'required': ['floor_area_m2', 'age_band', 'location'], 'properties': {'storeys': {'type': 'integer'}, 'age_band': {'enum': ['pre_1900', '1900_1929', '1930_1949', '1950_1966', '1967_1975', '1976_1982', '1983_1990', '1991_1995', '1996_2002', '2003_2006', '2007_2011', '2012_2022', '2023_plus'], 'type': 'string'}, 'location': {'enum': ['london', 'birmingham', 'manchester', 'glasgow', 'edinburgh', 'leeds', 'newcastle', 'cardiff', 'belfast', 'plymouth', 'southampton'], 'type': 'string'}, 'flow_temp_c': {'enum': [35, 45, 55], 'type': 'integer', 'description': 'Emitter flow temperature'}, 'floor_area_m2': {'type': 'number'}, 'air_change_rate': {'type': 'number', 'description': 'ACH, default 0.5'}, 'ceiling_height_m': {'type': 'number', 'description': 'Default 2.4'}, 'glazing_pct_of_floor': {'type': 'number', 'description': 'Default 25'}, 'external_design_temp_c': {'type': 'number', 'description': 'Override 99.6% external design temp'}, 'internal_design_temp_c': {'type': 'number', 'description': 'Default 21'}}}
mees_checker
England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties.
Esquema de entrada
{'type': 'object', 'required': ['property_type', 'current_epc_band'], 'properties': {'property_type': {'enum': ['domestic', 'non_domestic'], 'type': 'string'}, 'current_epc_band': {'enum': ['A', 'B', 'C', 'D', 'E', 'F', 'G'], 'type': 'string'}}}
part_o_overheating
UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative.
Esquema de entrada
{'type': 'object', 'required': ['location_risk', 'most_glazed_facade', 'floor_area_m2', 'glazing_area_m2'], 'properties': {'floor_area_m2': {'type': 'number'}, 'location_risk': {'enum': ['high', 'moderate'], 'type': 'string', 'description': 'high = listed London postcode districts (AD O Table C1)'}, 'glazing_area_m2': {'type': 'number'}, 'cross_ventilation': {'enum': ['yes', 'no'], 'type': 'string'}, 'most_glazed_facade': {'enum': ['N', 'E', 'S', 'W'], 'type': 'string'}, 'provided_free_area_m2': {'type': 'number', 'description': 'Total openable free area provided (optional)'}}}
part_s_ev
UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative.
Esquema de entrada
{'type': 'object', 'required': ['building_type', 'works', 'parking_spaces'], 'properties': {'works': {'enum': ['new', 'major_renovation'], 'type': 'string'}, 'dwellings': {'type': 'integer', 'description': 'Number of dwellings (residential)'}, 'building_type': {'enum': ['residential', 'non_residential'], 'type': 'string'}, 'parking_spaces': {'type': 'integer', 'description': 'Total associated parking spaces'}, 'covered_car_park': {'enum': ['yes', 'no'], 'type': 'string', 'description': 'Non-residential covered car park?'}}}
roi_calculator
Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.
Esquema de entrada
{'type': 'object', 'required': ['team_size', 'hourly_rate', 'manual_hours', 'efficiency_gain_pct', 'implementation_time_months'], 'properties': {'team_size': {'type': 'number'}, 'hourly_rate': {'type': 'number'}, 'manual_hours': {'type': 'number', 'description': 'manual hours per week'}, 'software_cost': {'type': 'number', 'description': 'annual GBP (default 0)'}, 'efficiency_gain_pct': {'type': 'number', 'description': '<=90'}, 'implementation_time_months': {'type': 'number'}}}
sap_sbem_precheck
UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.
Esquema de entrada
{'type': 'object', 'required': [], 'properties': {'sap_rating': {'type': 'number', 'description': 'Known SAP rating 1-100 (returns the EPC band)'}, 'floor_area_m2': {'type': 'number', 'description': 'For carbon/primary-energy intensity'}, 'annual_energy_kwh': {'type': 'object', 'description': 'Map fuel -> kWh/yr. Fuels: mains_gas, grid_electricity, heating_oil, lpg, wood_pellets, wood_logs, wood_chips, biomass_community'}}}
thermal_load
Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.
Esquema de entrada
{'type': 'object', 'required': ['it_load_kw', 'ups_efficiency_pct', 'room_area_m2', 'cooling_type', 'redundancy', 'ambient_temp_c'], 'properties': {'it_load_kw': {'type': 'number'}, 'redundancy': {'enum': ['n', 'n1', '2n'], 'type': 'string'}, 'lighting_kw': {'type': 'number', 'description': 'default 5'}, 'cooling_type': {'enum': ['crac', 'crah', 'dlc', 'immersion'], 'type': 'string'}, 'room_area_m2': {'type': 'number'}, 'ambient_temp_c': {'type': 'number'}, 'ups_efficiency_pct': {'type': 'number', 'description': '1-99.9'}}}
uae_climate_ghg
UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats.
Esquema de entrada
{'type': 'object', 'required': ['emirate', 'electricity_kwh'], 'properties': {'gas_m3': {'type': 'number', 'description': 'Annual natural gas (m3), alternative to gas_kwh'}, 'emirate': {'enum': ['dubai', 'abu_dhabi', 'national'], 'type': 'string'}, 'gas_kwh': {'type': 'number', 'description': 'Annual natural gas (kWh)'}, 'electricity_kwh': {'type': 'number', 'description': 'Annual grid electricity (kWh)'}}}
uk_planning_checker
UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA.
Esquema de entrada
{'type': 'object', 'required': ['property_type', 'proposal'], 'properties': {'listed': {'enum': ['yes', 'no'], 'type': 'string'}, 'location': {'enum': ['england', 'wales', 'scotland', 'ni'], 'type': 'string'}, 'proposal': {'enum': ['extension', 'loft', 'outbuilding', 'cou', 'newdwelling', 'subdivision', 'demolition'], 'type': 'string'}, 'article_4': {'enum': ['yes', 'no', 'unknown'], 'type': 'string'}, 'use_class': {'type': 'string', 'description': 'Existing use class (C3, C1, E, B2, B8, F1, F2, SG)'}, 'proposed_use': {'type': 'string', 'description': "Proposed use class (change of use only); 'same' if unchanged"}, 'property_type': {'enum': ['house', 'flat', 'commercial', 'industrial', 'agricultural', 'mixed'], 'type': 'string'}, 'conservation_area': {'enum': ['yes', 'no'], 'type': 'string'}, 'extension_depth_m': {'type': 'number', 'description': 'Rear extension depth (m), for extension proposals'}, 'national_park_aonb': {'enum': ['yes', 'no'], 'type': 'string'}}}
Añadido
sap_sbem_precheck
17 de September de 2026 a las 12:55
Añadido
uae_climate_ghg
17 de September de 2026 a las 12:55
Añadido
eed_datacentre_pack
17 de September de 2026 a las 12:55
Añadido
heatpump_heatloss
17 de September de 2026 a las 12:55
Añadido
mees_checker
17 de September de 2026 a las 12:55
Añadido
part_o_overheating
17 de September de 2026 a las 12:55
Añadido
part_s_ev
17 de September de 2026 a las 12:55
Añadido
uk_planning_checker
17 de September de 2026 a las 12:55
Añadido
digital_renovation_passport
17 de September de 2026 a las 12:55
Añadido
contractor_vetting
17 de September de 2026 a las 12:55
Añadido
dgnb_bim_readiness
17 de September de 2026 a las 12:55
Añadido
eu_cost_benchmarking
17 de September de 2026 a las 12:55
Añadido
eurocode_column_checker
17 de September de 2026 a las 12:55
Añadido
eurocode_beam_designer
17 de September de 2026 a las 12:55
Añadido
building_readiness
17 de September de 2026 a las 12:55
Añadido
building_carbon_footprint
17 de September de 2026 a las 12:55
Añadido
roi_calculator
17 de September de 2026 a las 12:55
Añadido
thermal_load
17 de September de 2026 a las 12:55
Añadido
calculate_carbon
17 de September de 2026 a las 12:55
Añadido
get_technical_dd_quote
17 de September de 2026 a las 12:55
Añadido
check_grid_feasibility_uae
17 de September de 2026 a las 12:55
Añadido
check_uae_cybersecurity
17 de September de 2026 a las 12:55
Añadido
check_uae_bim_compliance
17 de September de 2026 a las 12:55
Añadido
estimate_cooling_load
17 de September de 2026 a las 12:55
Añadido
assess_epbd_score
17 de September de 2026 a las 12:55
Añadido
check_nis2_readiness
17 de September de 2026 a las 12:55
Añadido
calculate_pue
17 de September de 2026 a las 12:55